OPENOVERLAND - EXPEDITION BOX V9, DIAMOND PLATE
Draft of 2026-11-23. Nothing here has been strength-checked.
Built by Morena Welding, Inc., San Diego - morenawelding.com

START WITH THE DRAWINGS: expedition-box-v9-drawings.pdf (eight 11 x 17 sheets):
  1 general arrangement   2 build sequence and checks   3 P1 flat   4 P2 flat
  5 floor, end plates, opening frame   6 door pan flat   7 door stiffeners and hardware positions
  8 cut list and bought parts
Every STEP file is in the same coordinates (mm), so the pieces overlay.
The STEP files are modelled with sharp bends: develop the flats with your own bend radius.

SUPPLIER CUTS AND BENDS - 0.100 in aluminium tread plate, pattern out (5052-H32 preferred, 3003-H22 accepted)
  P1-inboard-wall-ledge-upper-wall.step   2 bends   flat about 763 x 2492
  P2-top-and-outer-face.step              1 bend    flat about 1080 x 2492 - cut the door opening FLAT first
  E1-front-end-plate.step / E2-rear-end-plate.step  flat
  D1-door-pan.step                        4 flanges 20 deep, each with a 20 mm return lip (8 bends),
                                          corners welded, 3 latch cut-outs
  F1-floor-quarter-inch-plate.step        1/4 in plate (re-used from the flatbed)

MORENA WELDING MAKES - 6061
  A1..A4  opening frame, 1-1/4 x 1 x 1/8 in angle, welded inside the opening
  D2      door stiffeners, 1 x 1/2 x 1/8 in rectangular tube
  D3      latch doublers, 3/16 in smooth plate

BOUGHT
  3 x Southco N2-2-301-01-20 latch + 3 x pawl N2-21-101-24
      door cut-out 78.8 x 85.3 (corners chamfered 8), 4 x 7.2 holes on a 78 square - from Southco's STEP
  5 x Southco R6-20-23 concealed 180 deg hinge (bolt with isolators - do not weld stainless to aluminium)
  McMaster 1120A221 EPDM push-on seal (25 ft) on the frame lip + 4 x McMaster 4784N11 corners - leave the lip uncoated
  2 x 316 wire-rope stays; floor vents if the box carries propane

Reference: https://open-overland.com/docs/f550-crew-cab-203/bed/side-boxes
